TASK DESCRIPTION
Site Description
Galaxy Macau is a world-class luxurious resort includes food and beverage outlets, entertainment facilities and exclusive hospitality. The site consumes electricity, diesel and LPG with energy spend of MOP 236 million per year.
Energenz was entrusted by GEG’s Facility Management Department to conduct an Energy Audit of the entire mega-complex and all energy consuming system with a view to identify energy reduction opportunities. This audit follows the ASHRAE level 2 and ISO 500002 standard and was completed in 2 months.
Outcome
- Electricity saving initiatives identified at USD$ 6.54M pa
- Diesel saving initiates identified at USD $540,000 pa
Services Performed
Energy Audit with saving outcomes in the following areas:
- Lighting Efficiency and Control
- Central Plant Optimization (Chiller Plant / Heat Pump / HW Boiler)
- Vertical Transport Upgrade
- Steam Boiler Optimization
- Airside System Optimization
- Pool Facilities Opportunities
- Kitchen Refrigeration